Opening of the new Tabemax manufacturing facility

A major milestone in the development of our partner site Tabemax in Biale Blota, Poland was solemnly set on 28 June 2024.

The event on the occasion of the opening of the new production hall was attended by investors, Representatives from local politics and partner companies took part, including Dietrich Turck from Escha GmbH and our managing directors Bernd Odoj, Janett Mechel and Detlef Riedel. They presented, among other things, a symbolic tree of life, that our trainees made of copper wire and LEDs for this occasion. Monika Klosowicz, Witold Lipowicz, Danuta Staniszewski, Dietrich Turck and Bernd Odoj celebrated the official inauguration by cutting the ribbon.

With the PLN 25 million building, Tabemax is significantly increasing its production capacity. The additional 2,500 square meters of production space, 100 metres of high-bay warehouse and numerous office spaces are operated with renewable energy. The entire building has been designed and realized according to the latest technical and ecological standards. For example, in addition to a solar system, heat pump and heat recovery have been integrated.

Our partner Tabemax has been a provider of production services in the assembly and finished products for the electronics, telecommunication, automotive, medical and machine industrie since 1991. For ml&s, Tabemax has been a reliable and important part of the ml&s production strategy for several years.